Penmann successfully delivered a significant HVAC upgrade at Nutricia’s Liverpool-based production site, supplying a bespoke ventilation and climate control system built to comply with demanding hygiene and production criteria. The contract covered the design, supply, installation and commissioning of cutting-edge HVAC systems across non-production, Medium Care (MC) and High Care https://totalbookmarking.com/story20696989/penmann-finalises-specialist-hvac-installation-for-nutricia-s-production-facility-in-liverpool-in-line-with-fsi-phase-1-and-2