Ken Mattingly was moved within the assist crew into parallel training with Anders as backup CMP just in case Apollo eleven was delayed previous its supposed July launch day, at which issue Anders will be unavailable.[59] The new design Middle includes design and style, verification, and validation engineering groups https://mylesxxusq.blogprodesign.com/55308378/about-apollo2