The soil investigation report handed on the structural engineer for that design of pile Basis purpose must have the embedment length on the piles, the advisable measurements in the pile, the Protected working load of each pile dimension, along with other details Which might be needed for the structural engineer https://maps.app.goo.gl/YojC2P1gNve8wSuB6