G., in the event the code DI is offered, the subroutine expects a vector of size n containing The weather over the diagonal, although in the event the code GE is given, the subroutine expects an n×n array made up of the entries in the matrix. Know When to Quit: https://lapak7741738.ambien-blog.com/32798432/the-single-best-strategy-to-use-for-lapak-77